Monday, July 27, 2009

How To Rollnavy Neckerchief

The regional government in February 2010 will design Navalcarnero futuroaeropuerto

http://www.europapress.es/madrid/noticia-gobierno-regional-tendra-febrero- 2010-design-future-airport-Navan-20090726130525.html

MADRID, 26 Jul. (EUROPA PRESS)

The regional government will be in mid-February of next year 2010 to design the new North Airfield, placed between the Alamo and Navan, after having allocated so the final technical studies before suconstrucción, according to Europa Press sources from the Ministry of Transport and Infrastructure of the Community.

The contract was awarded to all companies Ute Ghesa Engineering and Technology, SA; CEMOS, and Control Engineering, SA, and Oriol Architecture, Ltd., for an amount of 1.18 billion euros, and will have six and a half months from 1 September for the elaboraciónde all necessary preparatory work for drafting the detailed design and execution of aerodrome works lSuroeste. Awarded the statements that have already been sent to supublicación the Official Gazette of the Community of Madrid (BOCM), aimed at the preparation of studies and technical projects of Phase I, ie prior to the drafting of the construction project of the Aerodrome Southwest, "essential for correctaplanificación and handling", said the sources.

Among the works that will have to prepare now highlights the Feasibility Study, which involves evaluating deemplazamientos technique for the location of the airfield, identifying the best alternative on the basis of the analysis. The plot is planned for the development of the aerodrome is located between the M-404 and R-5. They will also carry out the Master Plan, a detailed study of the definition of the service area of \u200b\u200bthe airfield and the activities planned in the different areas and the infrastructure necessary to ensure their accessibility, analyzing also the impact of the aerodrome the territory.

Another step is the development of the Special Plan as under the Law 9 / 2001 of 17 July, the Community Land Madrid, prepare all necessary documentation relating to town planning established and its suitability for general planning. In these six months, the companies also have to get down to work with environmental procedures (the study of Environmental Impact) - the subject of protest by some locals - in addition to the basic project to determine the configuration airfield, as well as urbanization and access to the airfield, and functional design of buildings (terminal, control tower, centraleléctrica, among other things).

shall be also applied to geological and geotechnical study for the design full and dimensioning previous works, to stop all prepared early next year and in the second half to begin the work of this new infrastructure that will be used exclusively for business flights and flight schools, which will allow the dismantling facilities of Four Winds, a historical demand of the residents of Carabanchel.

addition, this new airport will solve the problems dela aviation businesses that can not continue to operate from the base of Torrejón de Ardoz. It is therefore an aerodrome that is not primarily commercial and host, traffic flight schools, business aviation, flying sports aerial work (agroforestry and agriculture, aerial photography, small cargo, firefighting, emergency, or surveillance).


EcoDiario Also:

The regional government in February 2010 will design
Navalcarnero futuroaeropuerto http://ecodiario.eleconomista.es/espana/noticias/1433082/07/09/El-Gobierno-regional -shall-in-February-de-2010-the-design-of-future-airport-to-Navalcarnero.html

Wednesday, July 22, 2009

Strong Speghetti Bridge

Casarrubios airfield clogging Southwest Airport

THE TRIBUNE TOLEDO
05/04/1909 jaj / toledo

Interestingly, the project Huts new airfield is promoted by the company Aerohobby, the same which manages and operates an airfield near the Casarrubios. Airfield latter paradoxically, may now be the main obstacle to succeed the largest project planned in the air, Southwest Airport.

The large facility planned by the regional government of Madrid on the border with Toledo, absorb all flights and private jets sports in this Community. However, when the government included it in their Airport Infrastructure Plan in 2007, recognized a defect. Textually specifies that "Community-Madrid-drive the necessary agreements with the private airport Casarrubios ... to avoid any interference between the air spaces of both infrastructures. " In other words, both facilities are so close that could cross its air corridors off and landing, with the logical risk of collision. Sources familiar with the navigation state that this event could only be avoided if the new Madrid airport runway is built so that its path parallel to the airfield will casarrubiero. Otherwise, he would only agree to Aerohobby for transferring its activity Casarrubios.

Moreover, the Community of Madrid has already tendered the drafting of the implementation of the airport worth 1.7 million. By late June, the company could meet will design the facility.

Simplehuman Soap Dispenser Instructions

Extract from the minutes of July 18, 2009

following topics were discussed:

--- Report on the collection of documents in Navan and The Álamo.Se reported the collection of documents in Navan and The Álamo.Más information on the Internal Forum http : / / calypofado.en.eresmas.com

--- Report on submission of documents Madrid.La Community Development and delivery of documents in Development incidencias.La no disclosure of documents in the Madrid explained Miguel.Más information on the Internal Forum http://calypofado.en.eresmas.com

--- Report on the meeting reported Arroyomolinos.Se Arroyomolinos.Más meeting information on the Internal Forum http://calypofado.en.eresmas.com

--- Report of the situation the Plataforma.La Platform is going through a situation that could definirlacomo crítica.Más information on the Internal Forum http://calypofado.en.eresmas.com
gastos.Los
--- Presentation of expenditure has been 6'65 € being the total available 95'30 €. As you can see on the Web. ---

mercadillo.La Mesa in the market will table the first Sunday of each meshasta there are more volunteers.

---- Banner Banner tenis.La track will be repaired with another material that is more resistentea inclement weather and allow a better spend aire.Se been responsible for this task voluntarios.Se few considered that the amount shall not exceed 30 €. ---

Posters in Ayuntamiento.Al panels seem to leave no signs in delAyuntamiento panels, the former mayor was the one that gave us elpermiso.

alcaldesa.La --- Interview with the mayor has not responded to requests to interview her. ---

recent article in the periódicos.Se commented on some articles in the press a certain interés.Más information on the Internal Forum http://calypofado.en.eresmas.com

--- Letters and messages sent to different organismos.Se reported the written information sent to different organismos.Más Internal Forum in http://calypofado.en.eresmas.com

Without further business the meeting adjourned.

Tuesday, July 21, 2009

How Do You Get Rid Of A Stiff Neck

Hope Aguirre continues its interests despite the crisis ...

Montiel Reyes Member of UI in the Madrid Assembly
Monday July 20, 2009

At the top of the whole world fits in times of crisis we must prioritize and that some of the projects originally intended will have to wait .

Like all decisions, is a political issue and that is where they really reflected the draft of each program. I

if Aguirre (no, sorry that I can not imagine), if the President of the Community of Madrid, Minister of Transport or rule out:

- The Road Plan, would undertake the reforms I really necesariasy focus on specific black spots
- rule out the closure of the M-50
- Airport rule out the Alamo.


and prioritizes:
- The arrival of Metro-Bus
- The Sale of Payment for people with disabilities
- Extension the Youth Pass from 21 to 23 years, adopted by this assembly and have not yet given any explanation
- Various measures to support the mobility of the unemployed. This does not even passed when presented in the Debate on Crisis in May.


And what did Esperanza Aguirre? Well, quite the opposite. Go ahead with measures that only aim to not stop the TBMs and forget about the mobility of people.

http://elblogdereyesmontiel.blogspot.com/2009/07/las-prioridades-de-esperanza-aguirre-en.html